APQP Deliverables for OEM Silicone Hose Projects
For automotive Tier 1 / Tier 2 silicone hose OEM programs, APQP deliverables represent the complete quality-planning documentation package prior to series-production release. Hotop generates and submits project-specific quality records aligned with AIAG-APQP guidelines, eliminating documentation gaps before PPAP submission and SOP handover.
Request Sample & Level 3 PPAP Package
Hotop Standard APQP-PPAP Document Scope
Our default submission follows PPAP Level 3, the baseline requirement for most automotive serial projects. We adjust submission levels (Level 1-4) according to your SQE’s customer-specific requirements.
Engineering & Risk-Planning Documents
- DFMEA (Design FMEA): design-risk analysis, applied for supplier-responsible design scope
- PFMEA (Process FMEA): manufacturing-failure-mode risk assessment for silicone hose mandrel forming, layup, curing and finishing
- Process Flow Diagram: end-to-end manufacturing map from raw silicone compounds to finished hose shipment
- Production Control Plan: aligned directly with PFMEA; defines inspection points, measurement methods, sampling frequency and reaction plans for deviations
- Gauge / MSA Measurement System Analysis for critical and special characteristics
Validation & Test Documentation
- Dimensional layout reports (ballooned drawing inspection results against customer controlled drawings)
- Material certification records for silicone compounds, reinforcement fabrics and liner materials
- Performance validation test reports: burst pressure, pulse fatigue, thermal cycling, aging, media compatibility testing
- Golden sample documentation and traceability records for pre-production parts
Automotive Compliance Material Declarations
- Complete IMDS submission & confirmation reports
- REACH, RoHS and ELV compliance documentation as required for automotive component supply
- Subsupplier material traceability records
PPAP Formal Submission Package
- Part Submission Warrant (PSW)
- Run-at-rate production records
- Initial process capability study (Cpk) for designated special characteristics
- Customer-specific requirement matrix & closure evidence
- 8D reporting template for post-submission nonconformity resolution
All documents are project-controlled and traceable; revisions are managed via formal ECN change control before and after SOP.
How these deliverables fit within your OEM project flow
These documents are built progressively across the OEM Workflow: DFM review > tooling fabrication > prototype validation > final APQP package consolidation > PPAP submission. Full APQP-PPAP approval serves as the formal approval gate, before transferring program governance into our Series Production Control process.
Clarification of scope
- Where the customer retains full design ownership, Hotop executes PFMEA, process control and validation activities based on your released drawings and specifications.
- Where Hotop undertakes co-design work, DFMEA is also delivered as part of the deliverable set.