APQP Deliverables for OEM Silicone Hose Projects

For automotive Tier 1 / Tier 2 silicone hose OEM programs, APQP deliverables represent the complete quality-planning documentation package prior to series-production release. Hotop generates and submits project-specific quality records aligned with AIAG-APQP guidelines, eliminating documentation gaps before PPAP submission and SOP handover.


Request Sample & Level 3 PPAP Package


Hotop Standard APQP-PPAP Document Scope

Our default submission follows PPAP Level 3, the baseline requirement for most automotive serial projects. We adjust submission levels (Level 1-4) according to your SQE’s customer-specific requirements.

Engineering & Risk-Planning Documents

  • DFMEA (Design FMEA): design-risk analysis, applied for supplier-responsible design scope
  • PFMEA (Process FMEA): manufacturing-failure-mode risk assessment for silicone hose mandrel forming, layup, curing and finishing
  • Process Flow Diagram: end-to-end manufacturing map from raw silicone compounds to finished hose shipment
  • Production Control Plan: aligned directly with PFMEA; defines inspection points, measurement methods, sampling frequency and reaction plans for deviations
  • Gauge / MSA Measurement System Analysis for critical and special characteristics

Validation & Test Documentation

  • Dimensional layout reports (ballooned drawing inspection results against customer controlled drawings)
  • Material certification records for silicone compounds, reinforcement fabrics and liner materials
  • Performance validation test reports: burst pressure, pulse fatigue, thermal cycling, aging, media compatibility testing
  • Golden sample documentation and traceability records for pre-production parts

Automotive Compliance Material Declarations

  • Complete IMDS submission & confirmation reports
  • REACH, RoHS and ELV compliance documentation as required for automotive component supply
  • Subsupplier material traceability records

PPAP Formal Submission Package

  • Part Submission Warrant (PSW)
  • Run-at-rate production records
  • Initial process capability study (Cpk) for designated special characteristics
  • Customer-specific requirement matrix & closure evidence
  • 8D reporting template for post-submission nonconformity resolution

All documents are project-controlled and traceable; revisions are managed via formal ECN change control before and after SOP.

How these deliverables fit within your OEM project flow

These documents are built progressively across the OEM Workflow: DFM review > tooling fabrication > prototype validation > final APQP package consolidation > PPAP submission. Full APQP-PPAP approval serves as the formal approval gate, before transferring program governance into our Series Production Control process.

Clarification of scope

  • Where the customer retains full design ownership, Hotop executes PFMEA, process control and validation activities based on your released drawings and specifications.
  • Where Hotop undertakes co-design work, DFMEA is also delivered as part of the deliverable set.

Navigate Within Our OEM Program

You have previously reviewed OEM Workflow and Tooling & NDA. Once APQP-PPAP documentation gains customer sign-off, project governance transfers to Series Production Control for stable serial supply. View real-world program references at OEM Case Study.

Discuss your project-specific documentation requirements